Description
The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. The overall project was substantially completed in December 2015. This video shows time-lapse documentation of the construction of a concrete truck apron at the intersection of US 31 and 106th Street in Carmel, Indiana.
The project is located at 39.9416555,-86.1581234.
Cite this work
Researchers should cite this work as follows:
- Bunnell, W. A.; Krohn, D. W.; Bullock, D. M. (2016). Truck Apron Construction US 31 and 106th Street. Purdue University Research Repository. doi:10.4231/R7M61H71