Description
This time-lapse video is the second in a series of composite datasets that documents the demolition of Engineering Administration Building (ENAD), the old power plant and the subsequent construction of the Active Learning Center. This composite video shows a wrecking ball initiating demolition on October 20, 2014, and subsequent demolition proceeding through December 10.
The full data collection can be found at http://dx.doi.org/10.4231/R70P0WXD.
Acknowledgements
This video was produced by the Joint Transportation Research Program (JTRP) with funds received from Purdue’s Office of Engagement for the Corps of Engagement Award received in May 2014. Cameras and on-going capture of photos documenting the ENAD and power plant demolition and the future construction of the Active Learning Center are funded by the Purdue Libraries and Kresge Challenge Funds from the Lyles School of Civil Engineering. Camera installation was coordinated by Alex Hainen (ahainen@eng.ua.edu), Andy Sydelko, and Dave Burford.
Cite this work
Researchers should cite this work as follows:
- Bullock, D. M.; Deborah Horton; Morris, T.; Li, H. (2015). Purdue University Old Power Plant Building Demolition (composite). Purdue University Research Repository. doi:10.4231/R72F7KCC